REVISION HISTORY

REV.

DESCRIPTION OF MODIFICATION

DATE

1

First Issue for Comment

5 Mar 2020

2

Revision according to EPD’s comments

3 Jun 2020

3

Revision according to EPD’s comments

10 Nov 2020

4

Revision according to EPD’s comments

29 Jan 2021

5

Revision according to RSS’s and IEC’s comments

18 Jan 2022

6

Revision according to EPD’s comments

31 Mar 2022

7

Update of implementation schedule of Table 2.1

01 Mar 2024

8

Revision according to revised slope mitigation works design

13 Feb 2026

9

Revision according to EPD’s comments

13 Mar 2026

10

Revision according to EPD’s and PlanD’s comments

29 April 2026

11

Revision according to PlanD’s comment

12 June 2026

12

Revision according to EPD’s comment

3 Jul 2026

CONTENTS

Page

1. Introduction ..................................................................................................................................................................... 5

1.1. Background ............................................................................................................................................................. 5

1.2. Contract Description ........................................................................................................................................... 6

1.3. Purpose of the Plan .............................................................................................................................................. 6

1.4. Update of the plan ................................................................................................................................................ 7

2. Proposed Landscape and Visual Mitigation Measures ................................................................................... 8

3. Aesthetic Landscape and Architectural Treatment for Above Ground Structures ........................... 15

3.1. Minimization of Construction Area and Area for Temporary above Ground Structures (MM1) .................................................................................................................................................................................... 15

3.2. Minimization of Above Ground Structures (MM2) ............................................................................... 15

3.3. Aesthetic Landscape and Architectural Treatment for Above Ground Structures (MM3) .. 16

3.3.1. Green roof ................................................................................................................................................... 16

3.3.2. Roadside planting .................................................................................................................................... 16

3.3.3. Vertical greening ...................................................................................................................................... 17

3.3.4. Screening planting along the site ...................................................................................................... 17

3.3.5. Landscape areas ....................................................................................................................................... 17

3.3.6. Aesthetic treatment of all structures ............................................................................................... 17

3.3.7. Fairface finishing ..................................................................................................................................... 18

3.3.8. Prefabricated fairface concrete façade cladding......................................................................... 18

3.3.9. Paving materials ....................................................................................................................................... 19

3.3.10. Permeable perimeter fence ................................................................................................................. 19

3.3.11. Architectural feature fins ..................................................................................................................... 19

3.4. Slope Mitigation Works (MM6) .................................................................................................................... 19

3.5. Lighting Arrangement (MM8) ....................................................................................................................... 21

3.5.1. General ......................................................................................................................................................... 21

3.5.2. Garden Lights in Operation Phase .................................................................................................... 22

4. Tree Felling and Preservation Proposal (MM4) .............................................................................................. 23

5. Construction Mitigation Measures ....................................................................................................................... 24

5.1. Blending in with the Existing Landscape and Visual ........................................................................... 24

5.2. Providing soft landscaping ............................................................................................................................. 25

5.3. Conserving/Recovering Existing Greenery ............................................................................................. 25

5.4. Implementing Good Site Practices/ Other Recommended Mitigation Measures .................... 25

5.5. Conducting Regular Site Audit ...................................................................................................................... 25

6. Conclusion ....................................................................................................................................................................... 25

LIST OF APPENDICES

Appendix A

Layout Plan of Works Area under Contract No. 13/WSD/17 Appendix B

Tree Survey Result

Appendix C

Implementation of L&V Mitigation Measure (Operation Stage) Appendix D

DPTKO Building Layout Plan

Appendix E

Soft Landscape Design

Appendix F

Hard Landscape Design

Appendix G

Lighting Plan

Appendix H

Detailed Design for Slope Mitigation Works

1. INTRODUCTION

1.1. BACKGROUND

Pursuant to the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection granted the Environmental Permit (No. EP-503/2015) and Variation of Environmental Permit (No. EP-503/2015/B) to Water Supplies Department (WSD); and granted the Further Environmental Permit (No. FEP-01/503/2015/B) to AJCJV for the Contract.

The Acciona Agua, S.A. Trading, Jardine Engineering Corporation, Limited and China State Construction Engineering (Hong Kong) Limited As AJC Joint Venture (AJCJV) is contracted by WSD to carry out the Design, Build and Operate First Stage of Tseung Kwan O Desalination Plant (DPTKO) under Contract No. 13/WSD/17 (“the Contract”). The Further Environmental Permit (No. FEP- 01/503/2015/B) to AJCJV to construct the designation contract.

Acuity Sustainability Consulting Limited (ASCL) is commissioned by AJCJV to undertake the Environmental Team (ET) services as required and/or implied, both explicitly and implicitly, in the Environmental Permit (EP), Environmental Impact Assessment Report (EIA Report) (Register No.

AEIAR-192/2015) and Environmental Monitoring and Audit Manual (EM&A Manual) for the Contract;

and to carry out the Environmental Monitoring and Audit (EM&A) programme in fulfillment of the EIA Report’s EM&A requirements and Contract No. 13/WSD/17 Specification requirements.

Before WSD taking over the area for DPTKO development, the construction and demolition (C&D) materials being stockpiled and grown vegetation had been removed for construction projects. Prior to being handed over the area for DPTKO development, the area for the proposed desalination plant had been cleared of the stockpiled C&D materials and grown vegetation. It was then handed over to WSD when the finished ground level reached +5.2mPD.

In 2017, design variations of Contract were proposed, the design variations in relation to landscape and visual impacts are mainly the changes in Contract layouts, which includes; the relocation of building blocks with increase in building height within the original earmarked site defined in the EIA report; the reduction of the site area for desalination plant and; the reduction of slope mitigation works inside the Clear Water Bay Country Park (CWBCP). In 2025, design variations in relation to the reduction of slope mitigation works were further proposed to alleviate the high construction risk after frequent landslides.

The change in magnitude of landscape and visual impacts of the design variations from the EIA report have been thoroughly assessed and discussed in the Environmental Review Report (ERR) prepared by Black & Veatch (now known as Binnies HK Ltd.) on 03 November 2017. The ERR has concluded that the revised Contract layout will not change the overall landscape and visual impact levels presented in the EIA Report with mitigation measures in place. No additional mitigation measures are considered required for the proposed Contract variations. The environmental outcome from landscape and visual perspectives anticipated in the EIA Report will remain valid and applicable to the latest design.

1.2. CONTRACT DESCRIPTION

The Contract includes the following key components/works:-

Stage 1 Desalination Plant works (undertaken by Contract No. 13/WSD/17) •

construction of the seawater treatment components for the First Stage of the proposed desalination plant with a water production capacity at 135,000 cubic metres (m3) per day and with provision for future expansion to the ultimate water production capacity at 270,000 m3 per day when necessary, and associated facilities;

• formation of an eight-hectare site in TKO Area 137 for the construction of the proposed desalination plant and associated facilities with the ultimate water production capacity at 270,000 m3 per day;

• construction of the intake and outfall facilities of the proposed desalination plant to cater for the ultimate water production capacity of the proposed desalination plant at 270,000 m3 per day.

• natural slope mitigation works within the Clear Water Bay Country Park, which overlooks the northeast boundary of the desalination plant at TKO Area 137; and •

associated works including engineering, environmental mitigation works and landscaping works.

Stage 2 Desalination Plant works (to be undertaken in other works contract(s)) •

(under planning stage);

Freshwater Main Alignment (undertaken by Contract No. 13/WSD/16) A dedicated trunk feed system including about 9 km long water mains for the transfer of freshwater output from the desalination plant to the existing Tseung Kwan O Fresh Water Primary Service Reservoir in Po Lam.

1.3. PURPOSE OF THE PLAN

According to Condition 2.11 of the FEP and EP-503/2015/B, a landscape and visual mitigation proposal shall be submitted to the Director of Environmental Protection for approval no later than 1 month before the commencement of construction of the desalination plant of the Contract. The proposal, with drawings in the scale of 1:1000 or other appropriate scales as agreed by the Director, shall show the landscape and visual mitigation measures of the Contract, and shall include at least the following information:

(1) aesthetic landscape and architectural treatment for above ground structures;

(2) tree felling and preservation proposal showing quantity, plant species, location(s) and size of trees to be retained/transplanted/felled/compensated, and location(s) of transplanted trees;

(3) Landscape Plan showing location(s) of greening works including green roofs, roadside planting, vertical greening, screen planting, amenity planting, edge treatment along boundary and any other landscape enhancement to mitigate landscape impact of the Contract.

The scope of this LVMP covers the landscape and visual mitigation measures under Contract No.

13/WSD/17. The site layout plan for Contract No. 13/WSD/17 is shown in Appendix A. Before submission to the Director, the Landscape and Visual Mitigation Proposal shall be certified by the Environmental Team (ET) Leader and verified by the Independent Environmental Checker (IEC) as conforming to the requirements and recommendations contained in the EIA Report (Register No.

AEIAR-192/2015), EP/FEP and ERR. All measures recommended in the approved Proposal shall be fully and properly implemented and maintained for the Contract.

1.4. UPDATE OF THE PLAN

In accordance with EP Condition 2.7, the Updated Vegetation Survey for Slope Mitigation Works (Issue 212‑2) was submitted on 24 July 2017 and subsequently approved by the EPD on 31 August 2017 (hereinafter referred to as the “2017 Vegetation Survey”). The 2017 Vegetation Survey Report documented the survey findings, assessed the potential impacts, if any, arising from the proposed slope mitigation works, and recommended appropriate protection and mitigation measures for plant species of conservation importance identified during the 2016 survey. A revised report was later prepared to update the 2017 Vegetation Survey by incorporating the findings of subsequent vegetation surveys conducted in 2020, 2021, and 2023 (hereinafter referred to as the “2026 Vegetation Survey”). The 2026 Vegetation Survey was submitted to EPD on 12 February 2026 and subsequently approved on 9 March 2026.

In accordance with EP Condition 2.8, the Detailed Design Plan for Slope Mitigation Works (Issue 214‑2) was submitted on 2 March 2018 and subsequently approved by the EPD on 20 April 2018 (hereinafter referred to as the “2018 DDP”). The 2018 DDP detailed the proposed slope mitigation works, including the installation of a flexible barrier, rock slope stabilisation works, boulder removal, and boulder break‑off.

A series of extreme weather events subsequently occurred in Hong Kong, including a 1‑in‑500‑year black rainstorm and Typhoons Saola and Koinu in September and October 2023, as well as an amber rainstorm in May 2024. These events triggered multiple landslides within the slope area located in Clear Water Bay Country Park. Following a review of the severity and frequency of the landslides in the relevant slope area in consultation with the Civil Engineering and Development Department (CEDD), and taking into account the low usage frequency and low risk to life and property at the slope toe area, the extent and arrangement of the slope mitigation works within Clear Water Bay Country Park were re‑examined. A reduced extent and revised arrangement of slope mitigation works were subsequently proposed to the Geotechnical Engineering Office (GEO) / CEDD. GEO/CEDD provided no further comments on the design of the slope mitigation works in its memorandum dated 4 March 2025 (Ref.: ( ) in ME‑30‑2025‑12‑226‑1). In accordance with EP Condition 2.8, the Detailed Design Plan for Slope Mitigation Works was updated to reflect the revised slope mitigation works design.

The updated Detailed Design Plan was subsequently approved by EPD on 22 June 2026 (hereinafter referred to as the “2026 DDP”).

The 2018 DDP presented the initial tree survey results within the project area, and the slope mitigation works area, which were conducted by WSD in November 2015 and March 2016. CEDD carried out an extensive tree felling exercise in 2018 in accordance with their approved tree felling application (LandsD’s approval memorandum ref. (30) in LM 2 to DLO/SK 651/SGS/59 Pt.6 dated 23 October 2018), prior to site handover to WSD in December 2019. Upon handover of the site in December 2019, tree surveys were conducted within the desalination plant site and along the temporary access for boulder removal and stabilisation by break-off works in February and August 2020 to establish a new baseline record of the existing trees by WSD following site handover. After the February and August 2020 tree surveys, it was identified that certain trees had not been felled by CEDD in accordance with CEDD’s approved tree felling application. Consequently, CEDD conducted additional tree felling operations in accordance with their approved application to remove those trees originally proposed for felling. In the subsequent period, the site was affected by typhoons and adverse weather conditions. As a result, prior to the commencement of the slope mitigation works, another series of tree surveys was carried out by WSD in February, May, and June 2022, and February 2023 within the desalination plant site, the areas for rock slope stabilisation works, the area for the proposed flexible barrier, and along the temporary access for boulder removal and stabilisation by break-off works. The 2026 DDP presents updated information based on the tree surveys carried out in February and August 2020, February, May and June 2022, and February 2023.

In accordance with EP Condition 2.10, the Landscape and Visual Mitigation Proposal (Rev. 7) was submitted on 1 March 2024 and subsequently approved by EPD on 8 March 2024 (hereinafter referred to as the “2024 LVMP”). Section 3.4 of the approved LVMP presents details of the slope mitigation works and the corresponding landscape and visual mitigation measures based on the information provided in the 2017 Vegetation Survey and the 2018 DDP.

This report aims to update the following information in accordance with the 2026 Vegetation Survey and 2026 DDP, and the refinement of the proposed site layout design in Section 3.2:

• Revision of slope mitigation works in accordance with 2026 DDP;

• Revision of landscape and visual mitigation measures for slope mitigation works with respect to the revised slope mitigation works; and •

Revision of tree survey results and the corresponding compensatory planting proposal in accordance with 2026 DDP

• A uniform setback of approximately 15 m from the project boundary was considered during the design process. Achieving such a setback would require a more compact and vertically stacked arrangement of treatment facilities, resulting in increased pumping requirements, higher energy consumption, reduced hydraulic efficiency, and greater lifecycle costs and environmental impacts over the plant's 50-year design life. This was one of the key considerations in the refinement of the proposed site layout. The proposed non-uniform setback reflects the operational, fire safety, and sustainability requirements of the

desalination plant. In particular, Workshop Y is located adjacent to the site boundary to provide operational efficiency and allows shared use with future desalination facilities .

Together with the provision of natural buffering and integrated landscape and visual mitigation measures, the design achieves the intent of the setback requirements while maintaining acceptable landscape and visual impacts. Section 3.2 has also been updated to reflect the actual site conditions.

2. PROPOSED LANDSCAPE AND VISUAL MITIGATION MEASURES

Section 11.10.3 of the approved EIA Report and Annex A of the EM&A Manual recommended the following mitigation measures. Explanations of how the measures are fulfilled are given in Table 2.1 and subsequent sections. Implementation details of mitigation measures under the Contract and the implementation schedule are described in Table 2.1 and subsequent sections. In compliance with Clause No. 2.11(iii) of the EP, Appendix C illustrates the layout of the landscape plan for the proposed greening works and landscape enhancement measures, with reference to MM3 and MM6 only. MM5 is not included in Appendix C, as the flexible barriers have been redesigned and relocated away from the slope toe of the Clear Water Bay Country Park, thereby eliminating the need for above‑ground works or soil nailing and avoiding any tree felling. Other landscape‑related mitigation measures are design requirements or measures to be implemented during the construction phase, and are therefore not shown in Appendix C.

Table 2.1 Landscape and Visual Mitigation Measures

ID in EIA Report

Recommended Mitigation Measure in Table 11.5 of the approved EIA report

Implementation Stage

Implementation Details of Mitigation Measures under the Contract

Timing for Implementation

Agent for Implementation, maintenance and management

MM1

The construction area and area allowed for temporary structures, such as the contractor’s office, will be minimized to a practical minimum. (Clause no. 2.11 (i) of EP)

Construction Stage

The construction area is limited to the contract area allowed in the EP.

Throughout the Construction Stage

AJCJV (The Contractor)

MM2

At the detailed design stage, the design team will seek to minimize the landscape footprint of the Project and above ground facilities, while satisfying all other requirements. (Clause no. 2.11 (i) of EP)

Detailed Design Stage

The landscape footprint is restricted to the contract area allowed in the EP. Please refer to Section 3 for explanation on how the coverage of ground facilities has been minimized.

During the Design Stage

Design Team of AJCJV

ID in EIA Report

Recommended Mitigation Measure in Table 11.5 of the approved EIA report

Implementation Stage

Implementation Details of Mitigation Measures under the Contract

Timing for Implementation

Agent for Implementation, maintenance and management

MM3

Design principles will be adopted to take into account the surrounding area, particularly Clear Water Bay Country Park behind and the nearby waterfront, with due consideration given to: - green roofs where practical (i.e. without equipment on the roof); - roadside planting; - aesthetic treatment of all structures; - vertical greening; - screen planting along application site; and - landscape enhancement with amenity planting where practical, including planting along the edge (site boundary) fence with native shrubs where feasible, to reduce their visual impact and blend them into the surrounding landscape. (Clause no. 2.11 (iii) of the EP)

Detailed Design Stage, Construction Stage, Operational Stage

Please refer to Section 3 for aesthetic landscape and aesthetic treatment of all above ground structures and Section 4 for soft landscape plan.

- During the Design Stage - Throughout the Construction Stage - Complete the mitigation measures before the commencement of operation of the First Stage of the Desalination Plant and maintained throughout the operation stage

Design & Construction Teams of AJCJV, and Operational Stage Contractor/WSD

MM4

All trees within the Project Site or the slope mitigation works area will be carefully protected during construction according to DEVB TCW No. 4/2020 – Tree Preservation. (Clause no. 2.11 (ii) of the EP)

Construction Stage

Tree surveys were conducted in 2020, 2022 and 2023, 148 nos. of tree are identified within the site area, 148 nos. of tree are proposed to be retained on site. Please refer to Section 4 for tree details. For tree located within the proposed slope mitigation works in Clear Water Bay Country Park, the existing trees will be carefully protected during the construction stage in accordance with DEVB TCW No.

Throughout the Construction Stage

AJCJV

ID in EIA Report

Recommended Mitigation Measure in Table 11.5 of the approved EIA report

Implementation Stage

Implementation Details of Mitigation Measures under the Contract

Timing for Implementation

Agent for Implementation, maintenance and management

4/2020 – Tree Preservation. The details of tree preservation shall refer to the approved Detailed Design Plan for Slope Mitigation Works.

MM5

No Tree within the Country Park will be felled. Trees within the Site unavoidably affected by the works will be transplanted where practical. For trees that need to be felled, compensatory planting will be provided to the satisfaction of relevant Government departments. A compensatory tree planting proposal including locations of tree compensation will be submitted to seek relevant government department’s approval, in accordance with DEVB TC(W) No. 4/2020. (Clause no. 2.11 (ii) of the EP)

Construction Stage, Operational Stage

The slope behind the proposed Desalination Plant is located within the Clear Water Bay Country Park. For tree located within the proposed slope mitigation works in Clear Water Bay Country Park, as flexible barriers are redesigned and located away from the slope toe of the Clear Water Bay Country Park area, no above- ground elements of the flexible barriers or soil nailing works are required, thereby no tree felling is proposed. In case of tree felling is necessary for slope mitigation works, a Tree Preservation and Removal Application will be submitted to relevant authorities for approval prior to tree felling works.

- Throughout the Construction Stage - Complete the mitigation measures before the commencement of operation of the First Stage of the Desalination Plant and maintain throughout the operation stage

AJCJV and Operational Stage Contractor/WSD

MM6

Any slope mitigation works necessary to address natural terrain hazards, will be minimized to minimize any potential environmental impact to the Country Park e.g. soil nailing and rock stabilisation will aim to avoid existing trees e.g. should any restoration of vegetation be necessary, the

Detailed Design Stage, Construction Stage, Operational Stage

The slope mitigation works have been designed to minimize landscape and visual impacts. Temporary working platforms and access routes to approach unstable boulders will be

- During the Design Stage - Throughout the Construction Stage - Complete the mitigation

Binnies (SOR), AJCJV and Operational Stage Contractor/WSD

ID in EIA Report

Recommended Mitigation Measure in Table 11.5 of the approved EIA report

Implementation Stage

Implementation Details of Mitigation Measures under the Contract

Timing for Implementation

Agent for Implementation, maintenance and management

best planting matrix with native species will be established, with the aim of resembling the existing vegetation. (Clause no. 2.11 (ii) of the EP)

planned to avoid existing trees during slope stabilisation activities. Wire mesh covering the rock face will be installed with openings around existing trees to ensure their preservation. Further details of the landscape and visual mitigation measures for slope mitigation works are provided in Section 3.4 of this LVMP. To reinstate vegetation lost or disturbed by the slope mitigation works, hydroseeding with selected grass and shrub species will be implemented. The hydroseeding areas and plant matrix are specified in Appendix E. Regular monitoring and appropriate maintenance will be carried out over a 12‑month establishment period to ensure successful vegetation recovery.

measures within 1 month of completion of the slope mitigation works and maintained throughout the operation stage

ID in EIA Report

Recommended Mitigation Measure in Table 11.5 of the approved EIA report

Implementation Stage

Implementation Details of Mitigation Measures under the Contract

Timing for Implementation

Agent for Implementation, maintenance and management

MM7

Dredging works for the installation of intake structures and outfall diffusers should be minimized to avoid or reduce any potential environmental impacts to as low as reasonably practicable (ALARP). The intake and outfall structures (e.g. intake openings and diffuser heads) will be prefabricated and transferred to site for installation. (Clause no. 2.11 (iii) of the EP)

Construction Stage

The Contractor will follow the requirement accordingly.

During the construction of the marine works

AJCJV

MM8

All night-time lighting will be reduced to a practical minimum both in terms of number of units and lux level and will be hooded and directional. (Clause no. 2.11 (iii) of the EP)

Construction Stage, Operational Stage

Please refer to Section 3.4 for lighting arrangement in construction and operational stages.

Throughout the construction stage and maintained throughout the operation stage

AJCJV, and Operational Stage Contractor/WSD

As recommended in the ERR, the following suggestions will be implemented by the Main Contractor:

• to minimise disturbances to vegetation during the construction works and shall be responsible to reinstate the vegetation in all temporary disturbed areas due to construction works to its original condition;

• Where appropriate, hydroseeding shall be applied to restore the green appearance on site;

• For any vegetation reinstatement or hydroseeding works, the appointed landscape contractor shall carry out regular monitoring and appropriate maintenance (e.g. replacement for unsatisfactory plant specimens) for a 12-month establishment period;

• The actual extent of rock slope works will be determined by the Supervising Officer during construction stage

3. AESTHETIC LANDSCAPE AND ARCHITECTURAL TREATMENT FOR ABOVE GROUND

STRUCTURES

3.1. MINIMIZATION OF CONSTRUCTION AREA AND AREA FOR TEMPORARY ABOVE GROUND

STRUCTURES (MM1)

The construction site is limited to the contract area allowed in the EP. The dimension of the DPTKO is around 500m long and 180m wide.

3.2. MINIMIZATION OF ABOVE GROUND STRUCTURES (MM2)

The site for the desalination plant is essentially a linear site and is oriented North West – South East along the longer side (Appendix A).

The design adopts a fragmented building layout that responds to the existing topography and surrounding natural landscape. Landscape buffering measures are incorporated to soften the interface between built structures and the natural environment, while building heights are minimised to reduce visual prominence. With these design strategies, the residual landscape and visual impacts are considered acceptable, notwithstanding the non-uniform setback arrangement.

The proposed structures do not exceed 35 m above future ground level. The majority of the buildings are one- to two-storey structures accommodating process facilities and building services. The Administration Building is the only exception, comprising five storeys with an approximate height of 33 m. The layout plan and sectional elevations of the DPTKO are presented in Appendix D.

Heights of all buildings do not exceed 35m above the future ground level. The roof level over the lift machine room of the Administration Building, the highest building for DPTKO, is +39.975mPD, about 33m above the ground level of +6.65mPD.

The entire development contains two types of buildings – desalination process plants and ancillary buildings. Following the flow of operational layout, the desalination process plant is separated into 4 treatment zones, namely Intake & Outfall Zone (Combined Shaft), Pre-treatment Zone (ActiDAFF), Reverse Osmosis Processing Zone (Reverse Osmosis Building) and Post-Treatment Zone (Post- Treatment Building). They span from southeast seashore toward the northwest side of the site.

Processed water will be gone through the final treatment process in the Product Water Storage Tank before fed to the TKO fresh water primary service reservoir.

The elongated site is enveloped by the richly vegetated Tin Ha Shan on the east and faces the sea (Tai Miu Wan) on the southeast. To integrate, blend, and connect/align the design with these surrounding natural environments, DPTKO is divided into 15 building blocks, dispersed around the site to avoid putting a large, single, disproportionate building mass on the site.

3.3. AESTHETIC LANDSCAPE AND ARCHITECTURAL TREATMENT FOR ABOVE GROUND STRUCTURES

(MM3)

The aesthetic landscape and architectural treatment of the site are designed to respond to occupational, recreational, and travelling sensitive receivers including the residents in the nearby Tseung Kwan O residential developments. The site has a high proportion of soft landscape (including at-grade greening, roof greening, and vertical greening), and numerous landscape areas are provided at various location of the site. The use of local species for both ornamental and boundary buffer facilitate the attainment of not less than 30% of landscape coverage areas to be planted with local plant species. These soft landscape designs provide a pleasant visual environment for the neighbouring communities is to create a successful destination with attractive external environment for the enjoyment of future visitors/ users. The soft landscape design of the DPTKO is shown in the Appendix E.

The key aesthetic landscape (soft landscape) includes the following;

1. Green Roofs

2. Roadside Planting

3. Vertical Greening

4. Screening planting along the site

4. Landscape Areas

3.3.1. GREEN ROOF

Six nos. of buildings, namely, Administration Building, Chemical Building, Reverse Osmosis & Electrical Building, Post-treatment Building, On-site Chlorine Generation System Building and CO2 Tanks Area, and Workshop are designed with green roof as showed in Appendix E. Groundcover will be the main vegetation provided in green roofs, the planting schedule and the proposed planting pattern for green roofs showed in Appendix E. The idea of the soft landscape design is to provide an extensive greening with low maintenance. The avoidance of tall shrubs and trees, especially near the PV panels which is situated in building Reverse Osmosis and Electrical Building are the concern not to block the normal operation of the PV panels.

3.3.2. ROADSIDE PLANTING

Apart from the undisturbed slopes in the periphery, the design incorporates roadside planting verges for ornamental trees, shrubs and groundcovers along the internal vehicular road. This will help provide shade while enhancing the visual amenity to the road users for visitors to the site. The proposed planting location and planting schedule are shown in Appendix E.

3.3.3. VERTICAL GREENING

7 no. of building, namely, Administration Building, Reverse Osmosis Building, Main Electrical and Chiller Plant Building, ACTIDAFF, Product Waters Storage Tank and Post-treatment Building and Combined Shaft Building are designed with vertical greening. Due to the nature of the industrial site, features of climbers on a vertical fence of 1.5m/ 3.5m high are proposed along its east and west boundary. Along the northern edge abut to WSD reserve, 2.5m high wire mesh fence with vertical green is proposed. A 3.5m high fence wall with vertical green is also proposed to the west of the Site.

Stainless steel wire and rope will be installed on wall and will act as the training system for the proposed climbing plant. The proposed planting location and species list are shown in Appendix E.

3.3.4. SCREENING PLANTING ALONG THE SITE

A 1.5m setback of fence at the main entrance is provided. In this setback zone, low shrubs and groundcover at a wavy pattern (Appendix E) is also provided to enhance the first impression of this particular Contract.

The establishment of functional tree belts to ameliorate external environmental effects such as noise, dust and unpleasant views is important consideration for this site – since it will be surrounded by roads with industrial heavy vehicles.

In addition to the aesthetic considerations the proposed trees, shrubs and groundcover planting will perform a number of functional roles. This will also provide a physical barrier between the hillside environment outside the site boundary and the areas inside the grounds of the facility, particular those adjacent to the main building blocks.

The plantation of heavy standard trees is extensively proposed on site as shown Appendix E. This will realize multiple environmental benefits including the provision of shade. Apart from the physical screening, the green buffer also functions as a noise barrier psychologically.

3.3.5. LANDSCAPE AREAS

Numerous landscape areas are provided at various locations such as, Main Entrance, Drop-off Plaza, Main Plaza, Landscape Plaza, Rain Garden, Courtyard area in Administration Building. Landscape designs at these locations are showed in Appendix E.

3.3.6. AESTHETIC TREATMENT OF ALL STRUCTURES

The siting and configuration of the DPTKO is designed to achieve a coherent suburban development consistent with the planning vision for TKO, and to create a compatible visual identity with the surrounding especially the adjacent Country Park (Clear Water Bay). The visual identity will focus on vigour and liveliness of TKO by identifying a family of façade materials, visual permeability at waterfront, matching of colour schemes, and fenestration control. The intervention of this contract activates the neighbourhood, inviting people to appreciate the built environment in the suburban distract.

The architectural design theme is a linear interpretation of water wave in macroscopical scale, which enhance/blend in with the surrounding environment and promote the green image of DPTKO. As “water” is the essence of the desalination plant, the character of water will be expressed throughout the design. The proposed construction materials and surface finishes will enhance/ blend in with the surrounding environment.

The key aesthetic treatment (hard landscape) includes the following;

1. Fairface concrete finishing for building structures;

2. Prefabricated fairface concrete façade cladding for building structures;

3. Paving materials of grey-tone colors in random mix as main floor finishes;

4. Permeable perimeter fence;

5. Architectural feature fins

3.3.7. FAIRFACE FINISHING

The buildings of DPTKO primarily use reinforced concrete with fairface concrete finish. The roofs are green or paved with light-colour materials and installed with solar panels. For the Administration Building, full-height glazing is designed to face north to maximise and diffuse natural light.

External façade deliberately uses fairface concrete as finish. The light grey colour of fairface concrete is a mixture of the natural colour of its ingredients, including aggregates, sand and cement. It is a neutral colour that blend in with other building materials and natural vegetation superbly. Architects world-wide are fond of using fairface concrete, to create creative identity to their buildings. With the combination of fairface concrete softened by vertical greening, the buildings blend into the surroundings, minimising the visual impact to both the neighbourhood and building users.

Some of the water storage tank and ancillary buildings will be appeared in traditional on-site cast fairfaced concrete façade. To enrich the façade and reduce the dullness along the site, texture paint finish is introduced to the buildings to echo with the rhythmic pattern for the DfMA façade building.

3.3.8. PREFABRICATED FAIRFACE CONCRETE FAÇADE CLADDING

Prefabricated fairface concrete façade cladding through DfMA system would be adopted for five buildings: ActiDAFF (a building in Pre-treatment Zone), Reverse Osmosis Building & Electrical Building, Post-Treatment Building, On-Site Chlorine Generation System Building and Product Water Storage Tank & Electrical Building. Typical building elevation with prefabricated fairface concrete

cladding and colors selected for the facade panels are shown in Appendix F. Arrangement of DfMA façade on these buildings is shown in Appendix F.

3.3.9. PAVING MATERIALS

Paving materials (mainly Paving Blocks) shall be hard wearing, durable and of low maintenance.

Concrete paver in grey tone (dark grey, light grey, and brown) mix in a random manner will be employed as the main floor finishes for the pavement, the material schedule and paving module plan are as shown in Appendix F.

3.3.10. PERMEABLE PERIMETER FENCE

Two area of the fence will adopt permeable perimeter fence to capture sea breeze, the linear arrangement of the building blocks creates “cooling corridors” in the complex by facilitating air flow and maximising natural breezes during summer. This corridor cooling effect helps create more effective cross ventilations and avoid heat accumulation in the summer days. The design details are shown in Appendix F.

3.3.11. ARCHITECTURAL FEATURE FINS

Architectural feature fins with blue color tone at ActiDAFF Building Shades of blue color tones were adopted along the visitors’ route. The selected colors will be applied to water pipes, GRP covers and architectural fins, to enrich the grey color of the fairface concrete. Most of the architectural fins articulated to form a wavy form in representing the relationship of the desalination plant and the sea.

The rendering of feature fins is shown in Appendix F.

3.4. SLOPE MITIGATION WORKS (MM6)

The Detailed Design Plan Slope Mitigation Works submitted under EP Condition 2.8 have recommended protection/ mitigation measures to be implemented on site during the construction stage of this Project. All recommended protection/ mitigation measures shall be fully and properly implemented. No site clearance works for slope mitigation works of this Project shall be allowed prior to the completion of such protection/ mitigation works on site. The key slope mitigation measures are summarised below and present in Appendix H:

Flexible Barrier

The flexible barriers will be located away from the slope toe of the Clear Water Bay Country Park (CWBCP). All above-ground elements of the flexible barrier are all located outside the CWBCP.

Inclined underground anchors, installed 3-4m into rock, are required and may extend into CWBCP boundary. The maximum length of the underground anchors shall be 15m. No ecological impact on plant species of conservation importance and trees anticipated as inclined anchors would be installed into bedrock situated 3-4m below the ground level.

Rock Slope Stabilisation/ Improvement Works

Rock stabilisation works will be adjusted to ensure that no tree will be felled, and no plant species of conservation importance are affected. The anchorage for the temporary working platform and access routes will be designed to avoid the plant species of conservation importance.

Slope mitigation works have been adjusted to suit the existing slope conditions, including 180m2 of wire mesh, 37 nos. of rock dowels, 5 nos. of buttress and flexible barrier along the slope toe. To reinstate vegetation loss and disturbance resulting from slope stabilisation works, hydroseeding and planting of grasses and shrub seedlings undertaken at the flexible barriers which will locate at the ground level adjacent to the existing slope toe. Regular monitoring and appropriate maintenance works to be carried out for a 12-month establishment period to ensure successful vegetation recovery, green effect and diversity.

As stated in the detailed design plan for the slope mitigation works, the design of the buttress wall and the requirement for tree rings were to be confirmed following rock mapping and assessment of the specific site conditions. Upon completion of the rock mapping and site surveys, it has been verified that the proposed buttress walls are aligned with sufficient spatial separation from all existing trees. This clearance ensures that tree roots, natural growth, and trunk movement will not interfere with, or impose any load on, the wall structure.

Tree rings are normally required when structural elements are located close to trees and may encroach upon the root zone or trunk. As the buttress walls have been intentionally designed with adequate spatial separation with the existing trees, no physical conflict between the existing trees and buttress walls is expected. The protective function typically provided by tree rings is therefore inherently achieved through the spatial separation, and additional tree rings would not offer further benefit.

The adopted design provides both structural safety and protection of existing trees without the need of tree rings. In addition, stone facing has been applied to the buttress walls to reinstate the natural appearance of the slope, and the wire mesh on the rock face has been detailed with openings at tree locations to avoid obstruction.

Boulder Removal/ Break-off

There are 6 nos. of unstable boulders will be removed and 4 nos. of boulders to be break-off. A temporary working platform and a minimum access clearance of 600 mm around each boulder will be provided for the proposed boulder removal/break‑off works. To avoid direct conflict between the boulder removal and nearby plant species of conservation importance, protection zones/ works exclusion zones will be established at least 1.5 m radius from the identified plant species of conservation importance to preserve them on site.

The protection zones/ works exclusion zones will be established prior to site clearance and throughout the construction period to separate the identified protected plant individuals from the works.

The temporary working platform and temporary access will be designed to avoid anchorage on the plant species of conservation importance.

Detailed design of the slope mitigation measures at Clear Water Bay Country Park could be referred to Appendix H and Detailed Design Plan for Slope Mitigation Works.

(https://www.tkodesal.hk/images/bv_tko_data/data/file/DDPIssue%209_all_flatten.pdf)

3.5. LIGHTING ARRANGEMENT (MM8)

3.5.1. GENERAL

All lights provided in the construction site or the proposed desalination plant should have the following features to minimize light spill outside the contract area:

• The number of lighting should be kept minimum;

• The lux level should be designed just sufficient for safety purpose;

• Point light towards the Site to minimize light spill outside the contract boundary;

• Shielded with hood to prevent sky glow;

• High mounting light will have less spill light and glare;

• Aim light no greater than 70º;

Reference: Guidance Note 01/20 Guidance Notes for the Reduction of Obtrusive Light •

Where light has to be pointed upward, adjust the light direction to ensure no spillage outside the target.

Reference: Guidance Note 01/20 Guidance Notes for the Reduction of Obtrusive Light

3.5.2. GARDEN LIGHTS IN OPERATION PHASE

The outdoor landscape lighting system is crafted with LED bollard lighting along the pathway and spotlight implants to the landscape area will light up the entire garden at night-time that creates a fascinating foreground focal area. Bollard light with low lux level just enough for illuminating the garden will be adopted. The light will be diffused without pointing in one direction. The proposed lighting plan can be found in Appendix G.

4. TREE FELLING AND PRESERVATION PROPOSAL (MM4)

As described in Section 1, the project site for the proposed desalination plant was cleared of stockpiled C&D materials and vegetation by CEDD prior to site handover. Tree felling was carried out by CEDD in accordance with its approved tree‑felling application (LandsD approval memorandum ref. (30) in LM 2 to DLO/SK 651/SGS/59 Pt.6 dated 23 October 2018), and the site was handed over to WSD in December 2019. Following site handover, tree surveys were conducted in February and August 2020 within the DPTKO area and along the temporary access for boulder removal and stabilisation by break-off works to establish the baseline tree condition. LVMP Revision 7 presented the survey results for the DPTKO area only, while trees surveyed along the temporary access were not included.

The 2020 tree surveys identified that some trees originally proposed for felling under CEDD’s approved tree‑felling application had not been removed. These trees were subsequently felled by CEDD in 2020. In addition, the site was affected by typhoons and adverse weather conditions in the subsequent period. To confirm the updated baseline tree condition prior to commencement of construction works, further tree surveys were carried out in February, May and June 2022, and February 2023, covering the DPTKO area as well as the tree survey areas for rock slope stabilisation works, flexible barriers, and the temporary access for boulder removal and stabilisation by break-off works. LVMP Revision 8 updated the number of existing trees based on the available tree survey results but was limited to the DPTKO area. LVMP Revision 9 consolidates all tree survey data and presents a complete and up‑to‑date baseline tree inventory covering all project‑related works areas.

The LVMP was updated progressively to reflect changes in site conditions arising from additional tree felling works carried out by CEDD, tree impacts from adverse weather events, and the availability of updated tree survey data prior to commencement of construction works. LVMP Revision 9 was prepared to consolidate all available tree survey results and to ensure that the baseline tree inventory fully covers all project‑related works areas, including DPTKO, rock slope stabilisation works, flexible barriers, and temporary access areas. This update was necessary to ensure accuracy, completeness, and compliance with prevailing EIA and LVMP requirements.

According to the tree surveys conducted in February and August 2020, February, May and June 2022, and February 2023, a total of 148 trees were recorded within the study area. Of these, three trees were located within the DPTKO area, while 145 trees were recorded within the tree survey areas for rock slope stabilisation works, flexible barriers, and along the temporary access for boulder removal and stabilisation by break-off works. All 148 trees were originally proposed for retention.

Following completion of the tree surveys, the site was affected by typhoons and adverse weather conditions, resulting in the collapse or loss of nine trees (i.e. T030, T031, T058, T059, T124, T128, T207, T216 and T217). Accordingly, a total of 139 existing trees are proposed for retention. The tree survey results are presented in Table 4.1 and Appendix B, while the tree treatment summary is provided in Table 4.2.

Table 4.1 Summary of Tree Survey Results

Scientific Name

Chinese Name

No. of tree(s)

Acacia confusa

台灣相思

6

Celtis sinensis

朴樹

13

Ficus hispida

對葉榕(牛乳樹)

12

Ficus microcarpa

細葉榕

4

Fiscus subpisocarpa

筆管榕

5

Ficus variegata var.

青果榕

1

Litsea glutinosa

潺槁樹

1

Macaranga tanarius var.

血桐

66

Mallotus paniculatus

白楸

15

Peltophorum pterocarpum

盾柱木(雙翼豆)

1

Phoenix hanceana

刺葵

2

Schefflrea heptaphylla

鵝掌柴(鴨腳木)

11

Sterculia lanceolata

假蘋婆

9

Trema tomentosa (Roxb.)

山黃痲

1

Leucaena leucocephala

銀合歡

1

Total nos. of trees

148

Table 4.2 Summary of Proposed Treatment to Existing Trees

Report record

No. of tree(s) to be retained

No. of tree(s) to be transplanted

No. of tree(s) to be removed

No. of tree(s) destroyed by adverse weather

Total nos. of tree(s)

Tree Survey

148

0

0

9

139

5. CONSTRUCTION MITIGATION MEASURES

Located in the public filling area, the site is not visually attractive and looks similar to a construction site. Nevertheless, landscape and visual mitigation measures in construction phase are recommended as below:

5.1. BLENDING IN WITH THE EXISTING LANDSCAPE AND VISUAL

• Construction area and works shall be minimized to prevent affecting nearby landscape environment;

• Area of temporary structures, such as the contractor’s office, shall be minimized to a practical minimum and located at less visual prominent locations.

• Decorative hoarding with appropriate colours compatible with the surrounding area shall be erected around all works areas to minimize the visual impacts;

• Avoid potential impact on existing coastline and seashore

5.2. PROVIDING SOFT LANDSCAPING

• Exposed area and soil stockpiles shall be hydroseeded or covered with visually unobtrusive materials/ tarpaulins;

• Green roofs shall be considered on site office where possible;

• Commence landscape planting at locations where construction work has been completed.

5.3. CONSERVING/RECOVERING EXISTING GREENERY

• Existing trees near the Contract Boundary and slope mitigation work areas, and retained trees within site boundary shall be carefully protected. Detailed Tree Protection Specification shall be followed;

• The Contractor shall include a detailed working method statement for the protection of trees prior to conducting any works next to all retained trees;

• Trees unavoidably affected by the works shall be transplanted where practicable. Where possible, trees should be transplanted direct to permanent locations rather than temporary holding nurseries.

5.4. IMPLEMENTING GOOD SITE PRACTICES/ OTHER RECOMMENDED MITIGATION MEASURES

• Sufficient drainage system shall be provided to control run-off from entering the sea;

• All night-time lighting will be reduced to a practical minimum both in terms of number of units and lux level and will be hooded and directional (See Sec.3.4).

5.5. CONDUCTING REGULAR SITE AUDIT

• Site inspection shall be undertaken regularly to ensure mitigation measures are being effectively implemented;

• Coordinate implementation programme with concurrent contract, if any, to minimize potential cumulative impacts and where possible reduce the period of disturbance to visual context.

6. CONCLUSION

The landscape and visual mitigation measures to be implemented under Contract No. 13/WSD/17 have complied with the requirements and recommendations contained in the EIA Report (Register No. AEIAR-192/2015), the EP, the FEP and ERR. All measures recommended in this LVMP will be fully and properly implemented and maintained for the Contract.

Page 27

Page 28

Page 29

Page 30

Page 31

Page 32

Page 33

Page 34

Page 35

Page 36

Page 37

Page 38

Tree Survey Schedule

Project Title:

Date of Survey:

2020/0210. 2020/02/19, 2020/08/20, 2022/02/15, 2022/05/03, 2022/06/02

Tree No.

Species

Measurement

Amenity value

Form

Health condition

Structural condition

Suitability for transplanting

Conservation status

Recommendation

Department to provide expert advice to LandsD

Additional Remarks

Scientific name

Chinese name

height (m)

DBH (mm)

crown spread

(high/medium/low)

(good/average/poor)

(high/medium/low)

Remarks

(retain/transplant/fell)

T001

Macaranga tanarius var. tomentosa

血桐

5

240

3

Medium

Average

Average

Average

Low

Near structure

N/A

Retain

AFCD

-

T002

Macaranga tanarius var. tomentosa

血桐

5

230

4

Medium

Average

Average

Average

Low

Near structure

N/A

Retain

AFCD

-

T003

Macaranga tanarius var. tomentosa

血桐

4

140

3

Low

Poor

Average

Average

Low

Poor form

N/A

Retain

AFCD

Bark crack

T004

Macaranga tanarius var. tomentosa

血桐

3

165

3

Low

Poor

Average

Average

Low

Poor form

N/A

Retain

AFCD

Leaning

T005

Macaranga tanarius var. tomentosa

血桐

3

130

3

Low

Poor

Average

Average

Low

Poor form

N/A

Retain

AFCD

Leaning

T006

Macaranga tanarius var. tomentosa

血桐

4

140

3

Medium

Average

Average

Average

Medium

-

N/A

Retain

AFCD

-

T007

Macaranga tanarius var. tomentosa

血桐

5

200

4

Medium

Average

Average

Average

Medium

-

N/A

Retain

AFCD

-

T008

Celtis sinensis

朴樹

7

170

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T009

Sterculia lanceolata

假蘋婆

5

130

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T010

Phoenix hanceana

刺葵

4

240

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T011

Macaranga tanarius var. tomentosa

血桐

5

150

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T012

Celtis sinensis

朴樹

8

240

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Cross branches

T013

Ficus hispida

對葉榕(牛乳樹)

5

289

5

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Multiple trunks

T014

Macaranga tanarius var. tomentosa

血桐

6

180

5

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T015

Macaranga tanarius var. tomentosa

血桐

6

191

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant trunks

T016

Phoenix hanceana

刺葵

4

285

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T017

Macaranga tanarius var. tomentosa

血桐

6

150

5

Medium

Average

Poor

Average

Low

On slope

N/A

Retain

AFCD

-

T018

Macaranga tanarius var. tomentosa

血桐

7

300

8

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Broken branch, Exposed dead wood on trunk

T019

Celtis sinensis

朴樹

9

297

7

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant trunks

T020

Celtis sinensis

朴樹

9

250

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T021

Macaranga tanarius var. tomentosa

血桐

6

140

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Broken branch

T022

Macaranga tanarius var. tomentosa

血桐

5

170

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T023

Litsea glutinosa

潺槁樹

5

140

4

Medium

Average

Poor

Average

Low

On slope

N/A

Retain

AFCD

-

T024

Macaranga tanarius var. tomentosa

血桐

5

130

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T025

Macaranga tanarius var. tomentosa

血桐

5

120

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T026

Macaranga tanarius var. tomentosa

血桐

9

240

7

Medium

Average

Poor

Poor

Low

On slope

N/A

Retain

AFCD

Codominant branches, dead tree

T027

Celtis sinensis

朴樹

6

140

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T028

Macaranga tanarius var. tomentosa

血桐

6

180

4

Medium

Average

Poor

Average

Low

On slope

N/A

Retain

AFCD

-

T029

Macaranga tanarius var. tomentosa

血桐

7

220

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T030

Macaranga tanarius var. tomentosa

血桐

4

95

4

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Destroyed by adverse weather

T031

Celtis sinensis

朴樹

7

140

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Destroyed by adverse weather

T032

Ficus subpisocarpa

筆管榕

7

230

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T033

Sterculia lanceolata

假蘋婆

6

130

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T034

Ficus subpisocarpa

筆管榕

6

120

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T035

Sterculia lanceolata

假蘋婆

5

150

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches

Tree Survey Schedule

Project Title:

Date of Survey:

2020/0210. 2020/02/19, 2020/08/20, 2022/02/15, 2022/05/03, 2022/06/02

Tree No.

Species

Measurement

Amenity value

Form

Health condition

Structural condition

Suitability for transplanting

Conservation status

Recommendation

Department to provide expert advice to LandsD

Additional Remarks

Scientific name

Chinese name

height (m)

DBH (mm)

crown spread

(high/medium/low)

(good/average/poor)

(high/medium/low)

Remarks

(retain/transplant/fell)

T036

Macaranga tanarius var. tomentosa

血桐

7

180

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T037

Ficus hispida

對葉榕(牛乳樹)

7

140

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches

T038

Macaranga tanarius var. tomentosa

血桐

7

155

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T039

Macaranga tanarius var. tomentosa

血桐

8

160

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T040

Macaranga tanarius var. tomentosa

血桐

7

130

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T041

Acacia confusa

台灣相思

10

150

7

Medium

Poor

Average

Poor

Low

On slope

N/A

Retain

AFCD

Root-plate movement

T043

Ficus subpisocarpa

筆管榕

5

200

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T044

Ficus hispida

對葉榕(牛乳樹)

5

163

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant trunks

T045

Macaranga tanarius var. tomentosa

血桐

6

150

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Leaning

T046

Ficus microcarpa

榕樹(細葉榕)

11

420

9

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches

T047

Ficus hispida

對葉榕(牛乳樹)

5

198

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant trunks

T048

Ficus microcarpa

榕樹(細葉榕)

5

197

4

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Multiple trunks

T049

Macaranga tanarius var. tomentosa

血桐

6

212

5

Medium

Average

Poor

Average

Low

On slope

N/A

Retain

AFCD

Codominant trunks

T050

Macaranga tanarius var. tomentosa

血桐

7

180

5

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Leaning

T051

Macaranga tanarius var. tomentosa

血桐

8

180

7

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T052

Ficus subpisocarpa

筆管榕

8

264

8

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T053

Ficus hispida

對葉榕(牛乳樹)

6

140

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T054

Macaranga tanarius var. tomentosa

血桐

6

160

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches

T055

Macaranga tanarius var. tomentosa

血桐

8

244

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant trunks

T056

Ficus microcarpa

榕樹(細葉榕)

10

407

9

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Multiple trunks

T058

Macaranga tanarius var. tomentosa

血桐

6

196

4

Low

Poor

Poor

Average

Low

On slope

N/A

Retain

AFCD

Climber Destroyed by adverse weather

T059

Macaranga tanarius var. tomentosa

血桐

6

120

3

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Destroyed by adverse weather

T060

Macaranga tanarius var. tomentosa

血桐

6

149

3

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Leaning

T061

Mallotus paniculatus

白楸

5

130

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

WSD

-

T064

Macaranga tanarius var. tomentosa

血桐

8

135

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T067

Macaranga tanarius var. tomentosa

血桐

7

185

7

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T076

Ficus microcarpa

榕樹(細葉榕)

5

120

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T078

Macaranga tanarius var. tomentosa

血桐

7

160

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T096

Macaranga tanarius var. tomentosa

血桐

7

150

4

Low

Poor

Average

Poor

Low

On slope

N/A

Retain

AFCD

Trunk wound

T104

Sterculia lanceolata

假蘋婆

6

105

4

Medium

Average

Average

Average

Medium

-

N/A

Retain

WSD

-

T106

Macaranga tanarius var. tomentosa

血桐

7

259

7

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Multiple trunks

T107

Macaranga tanarius var. tomentosa

血桐

5

170

4

Low

Poor

Average

Average

Low

On slope

N/A

Retain

AFCD

Leaning

T110

Macaranga tanarius var. tomentosa

血桐

6

198

4

Medium

Poor

Average

Poor

Low

On slope

N/A

Retain

AFCD

Leaning

T113

Sterculia lanceolata

假蘋婆

7

100

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T114

Ficus hispida

對葉榕(牛乳樹)

6

160

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

Tree Survey Schedule

Project Title:

Date of Survey:

2020/0210. 2020/02/19, 2020/08/20, 2022/02/15, 2022/05/03, 2022/06/02

Tree No.

Species

Measurement

Amenity value

Form

Health condition

Structural condition

Suitability for transplanting

Conservation status

Recommendation

Department to provide expert advice to LandsD

Additional Remarks

Scientific name

Chinese name

height (m)

DBH (mm)

crown spread

(high/medium/low)

(good/average/poor)

(high/medium/low)

Remarks

(retain/transplant/fell)

T118

Macaranga tanarius var. tomentosa

血桐

9

330

9

Medium

Poor

Average

Poor

Low

On slope

N/A

Retain

AFCD

Root-plate movement

T124

Macaranga tanarius var. tomentosa

血桐

6

140

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Destroyed by adverse weather

T125

Macaranga tanarius var. tomentosa

血桐

5

100

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T127

Ficus hispida

對葉榕(牛乳樹)

7

200

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Bark crack

T128

Macaranga tanarius var. tomentosa

血桐

6

140

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Destroyed by adverse weather

T139

Macaranga tanarius var. tomentosa

血桐

9

180

6

Medium

Average

Average

Average

Medium

-

N/A

Retain

AFCD

-

T140

Macaranga tanarius var. tomentosa

血桐

5

100

3

Medium

Average

Average

Average

Medium

-

N/A

Retain

AFCD

-

T141

Macaranga tanarius var. tomentosa

血桐

8

180

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T142

Macaranga tanarius var. tomentosa

血桐

7

230

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Abnormal bark crack

T143

Ficus hispida

對葉榕(牛乳樹)

6

170

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T144

Macaranga tanarius var. tomentosa

血桐

7

240

8

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T145

Ficus hispida

對葉榕(牛乳樹)

5

150

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T147

Macaranga tanarius var. tomentosa

血桐

8

330

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T148

Ficus hispida

對葉榕(牛乳樹)

6

190

4

Low

Poor

Poor

Average

Low

On slope

N/A

Retain

AFCD

Climber, Old termite track

T149

Macaranga tanarius var. tomentosa

血桐

7

260

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T150

Macaranga tanarius var. tomentosa

血桐

7

360

5

Low

Poor

Poor

Poor

Low

-

N/A

Retain

AFCD

Abnormal bark crack, dead branch, exposed dead wood

T152

Sterculia lanceolata

假蘋婆

7

210

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T153

Sterculia lanceolata

假蘋婆

7

280

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Multiple trunks

T155

Mallotus paniculatus

白楸

7

220

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T156

Celtis sinensis

朴樹

4

95

3

Medium

Average

Average

Average

Medium

-

N/A

Retain

AFCD

-

T159

Mallotus paniculatus

白楸

5

95

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T160

Celtis sinensis

朴樹

4

120

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T161

Acacia confusa

台灣相思

12

500

11

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant trunk

T162

Acacia confusa

台灣相思

4

240

1

Low

Poor

Poor

Poor

Low

On slope

N/A

Retain

AFCD

Topped, decay

T163

Acacia confusa

台灣相思

10

170

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Decay

T165

Macaranga tanarius var. tomentosa

血桐

7

210

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T166

Celtis sinensis

朴樹

8

210

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T201

Acacia confusa

台灣相思

4

110

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T202

Peltophorum pterocarpum

盾柱木(雙翼豆)

10

398

7

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T203

Celtis sinensis

朴樹

7

240

7

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T204

Schefflera heptaphylla

鵝掌柴(鴨腳木)

4

145

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T205

Celtis sinensis

朴樹

7

230

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Climber

T206

Celtis sinensis

朴樹

7

198

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Climber

T207

Macaranga tanarius var. tomentosa

血桐

8

230

10

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Destroyed by adverse weather

Tree Survey Schedule

Project Title:

Date of Survey:

2020/0210. 2020/02/19, 2020/08/20, 2022/02/15, 2022/05/03, 2022/06/02

Tree No.

Species

Measurement

Amenity value

Form

Health condition

Structural condition

Suitability for transplanting

Conservation status

Recommendation

Department to provide expert advice to LandsD

Additional Remarks

Scientific name

Chinese name

height (m)

DBH (mm)

crown spread

(high/medium/low)

(good/average/poor)

(high/medium/low)

Remarks

(retain/transplant/fell)

T208

Ficus hispida

對葉榕(牛乳樹)

7

190

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T209

Schefflera heptaphylla

鵝掌柴(鴨腳木)

7

220

8

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches

T210

Schefflera heptaphylla

鵝掌柴(鴨腳木)

8

225

8

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T211

Schefflera heptaphylla

鵝掌柴(鴨腳木)

5

110

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T212

Acacia confusa

台灣相思

8

260

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches

T213

Macaranga tanarius var. tomentosa

血桐

6

110

6

Low

Poor

Average

Poor

Low

On slope

N/A

Retain

AFCD

Leaning, exposed dead wood at trunk base

T214

Macaranga tanarius var. tomentosa

血桐

5

160

6

Low

Poor

Average

Poor

Low

On slope

N/A

Retain

AFCD

Leaning

T215

Trema tomentosa (Roxb.) H.Hara

山黃麻

5

120

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T216

Ficus subpisocarpa

筆管榕

11

468

12

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Exposed root wound Destroyed by adverse weather

T217

Schefflera heptaphylla

鵝掌柴(鴨腳木)

7

120

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Wound, dead branch Destroyed by adverse weather

T219

Ficus hispida

對葉榕(牛乳樹)

5

115

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T221

Schefflera heptaphylla

鵝掌柴(鴨腳木)

6

232

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T222

Macaranga tanarius var. tomentosa

血桐

6

220

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Leaning

T223

Macaranga tanarius var. tomentosa

血桐

6

290

7

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T224

Macaranga tanarius var. tomentosa

血桐

7

130

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T225

Macaranga tanarius var. tomentosa

血桐

7

130

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T226

Macaranga tanarius var. tomentosa

血桐

8

297

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T227

Ficus variegata var. chlorocarpa

青果榕

6

145

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Bark crack, wound

T228

Macaranga tanarius var. tomentosa

血桐

6

258

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T229

Schefflera heptaphylla

鵝掌柴(鴨腳木)

4

190

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T230

Macaranga tanarius var. tomentosa

血桐

9

200

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T231

Macaranga tanarius var. tomentosa

血桐

7

320

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T232

Macaranga tanarius var. tomentosa

血桐

6

170

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T234

Celtis sinensis

朴樹

8

160

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T235

Schefflera heptaphylla

鵝掌柴(鴨腳木)

4

140

5

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

Tree Survey Schedule

Project Title:

Date of Survey: 1 February 2023

Tree No.

Species

Measurement

Amenity value

Form

Health condition

Structura condition

Suitability for transplanting

Conservation status

Recommendation

Department to provide expert

2m Winthin Construction area

Additional Remarks

T236

Sterculia lanceolata

假蘋婆

6

100

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T237

Mallotus paniculatus

白楸

7

210

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches, climber

T238

Schefflera heptaphylla

鵝掌柴(鴨腳木)

5

130

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Branch crossed with a undersized tree

T239

Mallotus paniculatus

白楸

8

210

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Climber

T240

Schefflera heptaphylla

鵝掌柴(鴨腳木)

6

130

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Climber

T241

Macaranga tanarius var. tomentosa

血桐

8

240

6

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Bark crack

T242

Mallotus paniculatus

白楸

6

110

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T243

Sterculia lanceolata

假蘋婆

6

115

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T244

Mallotus paniculatus

白楸

7

120

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T245

Mallotus paniculatus

白楸

6

120

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches, climber

T246

Leucaena leucocephala

銀合歡

6

120

2

Low

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Invasive species

T247

Mallotus paniculatus

白楸

4

95

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T248

Schefflera heptaphylla

鵝掌柴(鴨腳木)

3

145

3

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T249

Mallotus paniculatus

白楸

6

125

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Codominant branches

T250

Mallotus paniculatus

白楸

6

110

4

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T251

Mallotus paniculatus

白楸

6

105

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T252

Mallotus paniculatus

白楸

6

95

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

-

T253

Mallotus paniculatus

白楸

6

100

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Climber

T254

Mallotus paniculatus

白楸

6

115

2

Medium

Average

Average

Average

Low

On slope

N/A

Retain

AFCD

Climber

Page 44

Page 45

Page 46

Page 47

Page 48

Page 49

Page 50

Page 51

Page 52

Design, Build and Operate

First Stage ofTseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

SITE SECTION AA’

APPENDIX B

475m

*E ■ m

= r

1 I

15m

SITE BOUNDARY

1)

d

l

THLE.

Dees

22m

SITE BOUNDARY

23m

16m

8m

5 • JJ

it

1 HTLRE,

14 i

u

I

i

K - POST TREATMENT BUILDING

C - ACTIDAFF

G - REVERSE OSMOSIS & ELECTRICAL BUILDING

R1 - ON-SITE CHLORINE GENERATION SYSTEM BUILDING AND CO2 TANK AREA J - PRODUCT WATER

STORAGE TANK AND

ELECTRICAL BUILDING

SITE SECTION A-A (SCALE 1:500)

475m

WTO

35m

I

i

i

i

i

'HMHIEIi

al

1 Hi

FAELL. II

th

_t

SITE BOUNDARY

SITE BOUNDARY

24m

16m

Sillii

15m

10m

7m

10m

i

i

G - REVERSE OSMOSIS & ELECTRICAL BUILDING

V- INSPECTION CORRIDOR

J - PRODUCT WATER STORAGE TANK

AND ELECTRICAL BUILDING

M - ADMINISTRATION BUILDING

K - POST TREATMENT BUILDING

B - COMBINED INTAKE & OUTFALL SHAFT

R0 - CHEMICAL BUILDING

X2 - GUARD HOUSE B

SITE SECTION B-B (SCALE 1:500)

V>|)

Appendix B - Figure B4

Page 54

Page 55

Page 56

Page 57

Page 58

Page 59

Page 60

Page 61

Page 62

Page 63

Appendix E - Soft Landscape Design

Landscape Design | Vertical Greening 1

(Vertical Greening)

Typical Vertical Greenina Elevation

- '

,2 A]

1 H

-

il

470 ■w

470 470 wil

ianri rurs

5 Lh" Ge HS

2PU RR wi£

115 WH 4

AMH fl 7 CA

50 . H . 5 W MS. ARE (.E]

7 • % ne MS FLA IOMTSCE)

4 Ai u 5*. HAES SR

M « S ns PT

AE NT$ wT MBER

kui w.ll

.tt

‘T

-

=

ins 1

E has '□ ». HL"

"uMiLr“I NLCE

E 40 W wilt

fl

—

AFTMDELT Jt!

f

SFTE M[WA VETH

Typical Vertical Greening Section

1L

i

MIN. 1.5m

VERTICAL

GREEN

■ i

INSIDE-Plant Area

OUTSIDE-Hillside

l MQ T MME

FI. PDST SMIOIG

« > » i !

ML ME 1

। ma PiFs A

ull RATE Mi NTS

m

w »5 ne us

RA

E

—A

(

i

-

V

j J.

3 ROWS OF

RAZOR WIRE

3 Open Channel

HIGH STRENGTH SECURITY FENCE

6 x 25 COVER STRIP

Vertical Greening adjacent to Open Channel

100 BOLTS S NUTS

Proposed 4m high 5000kJ flexible barrier HIGH STRENGTH SECURITY FENCE

Post

MIN. 1.5m

VERTICAL

GREEN

Ringnef .

Upslope cable

3.550 GMS LINE WIRE

3 v

50 x 50 X 6 L

INTERMEDIATE

L

Proposed Ground Level

0ST AT 1825 Ct

f

3.5m Min.

V

Flexible Barrier

3 Footing

within Part Area

Open

Channel

with min. 2m depth

Proposed Open

a

Channel

base slab

*

M

3 0m

4

upsfope anchor

upslope anchor

Appendix A - Figure A14

TKO Desalination Plant

Appendix E - Soft Landscape Design

Landscape Design | Vertical Greening 2

(Vertical Greening)

Typical Vertical Greening Zoomin Plan

[

]

INSIDE

IT

3000 1 rrve

ree

■

2900 1 ERTICAL GREENING (REFER TO LANDSCAPE DRAWING)

smr’d

100X100MM G.M.S. POST-PAINTED IN BLUE 8300 C/C s

a

I

50X100MM GMS.-RHS HORIZONTAL RAIL PAINTED IN BLUE r

RAZOR WIRES

-3 LINES DE MS 2-PLY BARBED WIRE 225 WITH 4

POINTS BARBS AT 75 C/C

1 do

150X150MM POWER COATED GMS

SGS FRAMES DARK GREEN COLOUR

4 c •

J u u u u u u u u u ulj u u u u u u u u u u u IH

100X100MM G.M.S.-R.H.S. POST-

PAINTED (RAL 7021\

50X100MM G.M.S.-R.H.S. HORIZ. FRAME-

PAINTED (RAL 7021)

8 (

100X5OMM GMS. POST PAINTED IN 3LUE/GREY (REFER TO DEMARCATIUN ON PLAN)

8

43

|OUTSIDE|

51

yp.) 75(Typ.)

50X100MM G.M.S.-R.H.S.

VERTICAL FRAME-PAINTED

(RAL 7021)

Typical Vertical Greening Elevation

Typical Vertical Greening Section

75(Typ.) 50(Typ.) 75(Typ.)

1171

100109109

n V

/

RAZOR WIRES

3 LINES OF MS.

2-PLY BARBED WIRE

32.5 WITH 4 POINTS

BARBS AT 75 C/C

C

8

RAZOR WIRES

8 t

I

o

O

■

e

%

—2

■

CT

L

.1

—

—

s

As

A.

■

J

g"

8 3 2 _ _ —

in

t 7

S

Q

s

is

100MM GM.S.-R.H.S.

HORIZONTAL RAIL

PAINTED IN BLUE

L

2 U

ra

i

is

5”s

2 I

5

—

”

C"

2 2 2 4

h P

■

E

s

- “

%

*

T

-t

a

%

3 4 ■ t

e r

3

50X100MM GMS.-RHS.

HURIZUNTAL RAIL

PAINTED IN Bl. UE

100X100 GMS-

POST-PAINTED IN

GM.S. ANGLE FIXED

WITH BIILTS t NUTS

s

BLUE 2300 C/C

1 s a

*e sp

■ t.

Jt / ;

?

■

i

)

■

2

-VERTICAL GREENING (REFER

TO LANDSCAPE DRAWING)

7 %

■

1 P

5 $

d

y

r.1

d

>

?

C

t

V

.2

i.

>

s

"

-

9. •>

(

5 1 ?

J

d

! -

'J -

2 3 r ) v

-

100X100MM G.M.S.

POST-PAINTED IN BLUE

■

2300 C/C

t

y

Q

in

t

&

o

CT

in ()

100X50MM GMS. POST-PAINTED IN

BLUE/GREY (REFER TO

DEMARCATION ON PLAN)

J

4-'

s

7 s

100X50MM GMS.

POST-PAINTED IN

BLUE/GREY (REFER TD

DEMARCATION DN PLAN)

■

C

? k 1

— e

• $

4 e

i

7

1 CT

in

Y

w

P

5 -

i; r;

r

GJ

£

f

s

i.

4 V *

‘t

2 /

t .

I OUT SI DE |

| INSIDE |

> <

is

s '

5 A £

B

)

< /

"

9 — s -

I

■ e

k s

pi $A s

y

N

t

A

/ ,

C

3 N

I59 V,

7 M

%

4 f

V 2

s

i • ■■

- -

■

f

-FILLET WELDING

/

4 i

( P

st

3,3

2 2 2 ■■

s s

F

I

I.S. BASE PLATE

r

2 5 3 _ f

L __

o—

50X100MM G.M.S.-R.H.S.

HORIZONTAL RAIL

PAINTED IN BLUE

, s

22 •

. -ANTER REFER TO

LANDSCAPE DESIGN DWG

, en x

- ■

te

T —

f

> h

.$

3 1 ERB

-

V

‘E-

OY

4 — t

y

5 J

for

77 ■ 3 ■"

-

1

C &

5 A -

o&

.2 >-

w

' sk

CARRIAGEWAY

J

1

rJ

s.

3000

CA

CONCRETE FOOTING

(SIZE REFER TO

STRUCTURAL DRAWING)

—4

Appendix A - Figure A15

TKO Desalination Plant

Appendix E - Soft Landscape Design

(Vertical Greening)

Landscape Design | Vertical Greening 2

... a

AU

ini

I

M

Typical Vertical Greening Section

Typical Vertical Greening Elevation

100090%

75(Typ.)50(Typ.)75(Typ.)

1111

r

r

1 RAZOR WIRES

3 LINES OF MS.

2-PLY BARBED WIRE

22.5 WITH 4 POINTS

BARBS AT 75 C/C

o CU

RAZOR WIRES

( in

I

M

3I?H

H

8l212

II-

C

o

o

o

5

s

I

3

33

-t

. 7

4 -

7

7’

1 S,

Ml Lu

—A

*

1

V

a

th

*1

E c

2 1 $ ■'

S0X100MM GM.S.-R.H.S.

CT n

HURIZUNTAL RAIL

PAINTED IN BLUE

7 s

t

A7 A y

o.

■

=

a

—

—

T

T

p

/ -

W

3 I3

2 < !

*

1 ■

A

z

*

1 4

1 %

li

%

1 /

-

• *

.4

7 M : N

M

7 11 7 !

y

5 5 J

J

J

. ■

a

2 7 7 s

"$

4 -t

I C

: u

2 § s

50X100MM GM.S.-RH.S.

HORIZONTAL RAIL

PAINTED IN BLUE

1

3

GM.S. ANGLE FIXED

WITH BOLTS 4 HUTS

E

r

a

T

S

wh

£b

2 i

s

ft

A

21

■

7

100X100 GMSr

POST PAINTED IN

- ce

l. I 2

s H 2

BLUE 2300 C/C

e

; I y

--°4

$

-VERTICAL GREENING (REFER

■

=

"u

TO LANDSCAPE DRAWING)

C s

3

7

‘4

< -

1

P.

4

A-

7 :

100X100MM GMS.

POST-PAINTED IN BLUE

5 . 2

■,

*

1. s -

• 4

1 j

7 t’t

/ J

J u

4 <

- <

%

J

j

• ]

2

0 2300 C/C

-

■ ( s

1:

i s s

cuf “e. -am

O

o u)

()

4,’

hij

-

_ —

H t

′ -

Q

CT

in()

j

100X50MM GMS.

POST-PAINTED IN

■

677

1.

2

■

r I

.4 ,

2 "

- a J . 4

-

57a

* I

"J

'J

4

-3

1

£ -

i -■

2

Cu

*

100X50MM G.M.S. POST-PAINTED IN

BLLE/GREY (REFER TO

DEMARCATION ON PLAN)

BLUE/GREY (REFER TO

DEMARCATION ON PLAN)

CT

m

1 ...

1 -

%

$

I

* I

r1

e »

st

-

,3

k

i rlJ2 -

OUTSIDE

INSIDE

6 e

■ 1

J

1 f

%

-

7 4 3 22 24 2 *

> f

s wi

j

A

1 2 ;

' I

] —

. L

’ * I

4 ■

— 1

-

-

A

»,

ILLET WELDING

J $

r

1A

2 t - - '

“ 2

va

13 ■f.

j

—

3 w

GM.S. BASE PLATE

al

FT

d

' 1

—

p

s

H

Fs

2

i

y

te

-

s

1.1’

■

4 i C

e a

s

?

j

I

r

5

3 }

>

c

K

w

2 h

2J

>■(•

Le

’1

-

. ?

BI

N

f

I

lb

E1A

1 - t

Ie

/I

' r

hr.4

ST

I

P

3

50XI00MM GM.S.-R.H.S.

HORIZONTAL RAIL

PAINTED IN BLUE

■I

- -

2 i

t

4 s

I

Voe S

.

/ 2

—

A —

yee

—

—=-

t 7

o—

r i

o

r r

ERB

$7

i f

37 ..

5 4*

PLANTER REFER TO

LANDSCAPE DESIGN DWG

q r

-

09 —

O

o cu

(he rep

o

f "

- ' 4 “t

-57 .

DC *34 ■ . —te.

—

2 ■

CARRIAGEWAY

J

FE-

o'

> “ - 7

—

J

• —

Y

i

s.

*,‘2 "

24

• =raw) w

4-7-2-ct

47. 6.

{".4‘a

CONCRETE FOOTING

(SIZE REFER TO

STRUCTURAL DRAWING)

Appendix A - Figure A16

14.d.

TKO Desalination Plant

Page 67

Appendix E - Soft Landscape Design

Landscape Design | Rain Garden

a

IP

s

d

dd

3 g

CONCRETE PAVER

BLOCK

OVERFLOW DRAIN

IK

PEBBLES W/ 15 -

20mm DIA

RAIN GARDEN PLANTING

approx. 152m

approx. 98m

FEATURE ROCKERIES

(NATURAL ROCK)

STONE BENCH

*■

L

1200mm

-

CONCRETE PAVER BLOCK

o

a

PLANTS WITH HIGH

TOLERANCE TO

FUNCTION OF HUMIDITY

(PLANTS REFER TO

PLANTING SCHEDULE)

600mm

"HrH

STONE BENCH

a

MAINTENANCE PATH

SAND DRAINAGE LAYER

GRAVEL TRANSITION AREA

SANDY LOAM

FILTER

MEDIA

- —

saw

■ ■

I

a

I

I

3 S-s

TO THE NEAREST DRAIN —

(SLOTTED DRAINAGE)

PIPES WITH FALL

0 5 10m

Appendix A - Figure A2

TKO Desalination Plant

Page 69

Page 70

Appendix E - Soft Landscape Design

Landscape Design | Drop off Plaza

0

5

10

20

50m

t

r

s

..

I;

r III

&

BLOW UP AXON

f

PLANTING AREAS

AT-GRADE PLANTER WALL WITH

MIN 1200mm (WITHOUT

DRAINAGE LAYER) SOIL DEPTH

“aree

£

ne

oshe

d

PAVER BLOCK WITH

RANDOM MIXING

FAIR FACE CONC. FEATURE

(800MM WIDTH)

------T

4 e&

::

1

8-

drainage layer)

(without

in

co ----

o

Vi

M-------

PLANTER BOX FAIR FACE

CONC. FEATURE

(1500MM WIDTH)

V

I

2 \

Y

"L

i

-A SECTION AT-GRADE PLANTER WALL 1 I al' MANHOLE WITH MATCHING FAIR FACE CONC. I COVER FEATURE r — — GRANOLITHIC FINISH PLANTING 1 PYO PLANTER ALONG STAIR AREAS IT II VA 11 Ltae 0. 11/ \T ! LL..X A - . $ “Wwav • IW‘33 I

WALL 1 I CHING FAIR FACE CONC. I FEATURE PLANTI STAIR AREAS Ltae - . $ “Wwav • IW‘33 I

PLANTI

NG

AREAS

!

AT

-

GRADE PLANTER

WALL

&

—

—

r

22 1

F

Appendix A - Figure A3

TKO Desalination Plant

Page 72

Page 73

Page 74

Appendix E - Soft Landscape Design

Landscape Design | Admin Building

I

I

l -

5. 1— -

—

i

i

I

i

I

r

i

i

i

A

B

: A

—

1 —

44 MAX 30“ SLOPE

MAX 30“ SLOPE

F

FLOOR FINISHES (BY OTHERS)

J

w KY

AAAg)

MlMav

HOMOGENEOUS TILE

300 X 600 X 10MM

(T-14)

1,

« s

“ex

7/ v.

$ )

CAO

FAIR FACED CONCRETE

APPROX

10-20MM

LOOSE WHITE PEBBLES

(P-01)

Ul/l/

29/1

y

A | LD

STONE BENCH 1

500 72/X7

. 1

tr

4

4

A

2

*

8 T

Z

2

CM

2 2

%

T

1 SI

,d

n.

4,

E

4

I

d

4

4 d

4 4 4 /

(

SOIL MIX

d 4 a

— WATERPROOFIN

SOIL MIX

ING

HTTI

3 7 REFER JO ARCHITECTS SPECS

d

4 H

ABASF MASTERSEAL M800 WP02)

d

d

d

WATERPROOFING

REFER TO ARCHITECT’S SPECS

REFER TO

DRAINAGE DRAWINGS

Section A

Section B

Appendix A - Figure A7

TKO Desalination Plant

Page 76

Appendix E - Soft Landscape Design

Landscape Design | Green Area Calculation

SE 5CUNDAR:

P

\\

I I " ■

I

VERTICAL GREEN 2

I

/

t

eNAABar

shssserssnssteraane

a

)

• 1

t

\

ur

1 19

2 ⑤

⑪

keele

ott

0

=•

—

Y

*M

"Ye

X ‘

⑮

FENCE

\

■ I

y

K

——-----

3 — -

I

LANDSCAPE PLAZA

③

⑥

Ⓐ

⑩

⑫

.

■ dee- 4

--

- — ----- - --

—— •-- I

- lew = =L ( “

l7

I

?

'ft

⑦

l | 1

“•—•

*

RAN GARDEN --

y g

if

1 a

/

—

!

r 5

- t

1’07

②

Ⓒ

■

r

Ⓑ

l

-13

I

f

-

.-----

o

④

5 _ I -

(2 -

N

I

-

")

TT

/

—

⑧

⑨

①

saunanussouonssnaann»sanT

oNNNEcinunnuzaak

Hl—A

ASSESSMENT AREA -AE

Ⓓ

VERTICAL GREEN

L

— —

GREEK ROUF

BOUNDARY IN.

⑬

' AT GRADE PLANTING

⑭

E

PV PANEL

*•

Ⓕ

SECURITY FENC

/

------- FE :

v

/

—y

ve

Ⓔ

ITEM

AREA (m2)

①

1252.578

②

736.357

③

42.288

④

250.301

⑤

805.819

⑥

1101.13

⑦

196.241

⑧

109.888

ITEM

AREA (m2)

⑨

200.463

⑩

91.075

⑪

2245.921

⑫

663.355

⑬

318.392

⑭

259.803

⑮

5426.849

TOTAL

13700.46

ITEM

AREA (m2)

Ⓐ

696.932

Ⓑ

736.342

Ⓒ

197.214

Ⓓ

162.64

Ⓔ

152.508

Ⓕ

622.136

TOTAL

2,567.772

0 5 10

20 50m

Appendix A - Figure A24

TKO Desalination Plant

Appendix E - Soft Landscape Design

Landscape Design | Green Area Calculation

SuE BDUNDARY

P

ASS

SYET AR A

—VERTICAL GREEN 2

7 F□

7777717 ⑤

⑪

•)

I

g

wipe LT

ur

-

"•]

tit

U

/

••• ■

1

⑮

FENCE -

dsoiussteitit"

③

I

y (

--

r

l

:•

.-------- LANDSCAPE PLAZA

&l 1

a G

.m.

4=a.

i

stal

...

FAIN GARDEN

=--=—rul

B

" rr t

t

t"s

1"

r

n

⑥

Ⓐ

⑩

⑫

? /

MS

⑦

1 ②

I

Ⓒ

1 I

I

/

Ⓑ

1 ④

I

] J

) B

X

*

- '■!

⑧

⑨

①

MMHHF

UMinnm

IHNUM vassi mi»w

EEL 2l

SICA- GREEN

ASSESSMENT AEA -AL

Ⓓ

. — • BOUNDARY LN

⑬

-------■ AT GRAF PLANTING AREA

>

1 i

⑭

i—-- GREEN R0C5

— -

aa Py PANE'

Ⓕ

Ⓕ

SECURTY FENCS

d

| +

____ FELC

Ⓔ

/

;■S

X.

SITE BOUNDARY: 56,120.8 SQM

30% GREENERY REQUIREMENT: 16,836.2 SQM

15% AT GRADE REQUIREMENT: 8,418.12 SQM

MAX. 30% CAP OF ALL GREENERY (VERTICAL GREEN, GRASS PAVER, COVERED PLANTING AREA): 5,050.86 SQM

0 5 10

20 50m

(Hence, the at grade greenery calculation requirement is achieved) AT GRADE TOTAL PLANTING AREA (EXCLUDING VERTICAL GREENING) : 13.700,46 SOM [1+2+3+4+5+6+7+8+9+10+11+12+13+14+15]

GREEN ROOF (EXCLUDING VERTICAL GREENING) : 2,567.772 SQM

[A+B+C+D+E+F]

(Detail refer to A15 and A16)

VERTICAL GREEN 1: 585.137(L) X 3(H) = 1,755.411 SOM envsanesnenes

(Detail refer to A14)

VERTICAL GREEN 2: 222.689(L) X 1.5(H) = 334.034 SQM TOTAL GREENERY AREA: 13,700.46 + 2,567.772 + 1,755.411 + 334.034 = 18,357.677 SQM (32.71%)

Proposed GAC 32.7% (18358 SQ.M.) > Required GAC 30% (16836 SQ.M.)

Appendix A - Figure A25

TKO Desalination Plant

Page 79

Page 80

Page 81

Page 82

Page 83

Page 84

Design, Build and Operate

First Stage of Tseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

Appendix F - Hard Landscape Design

APPENDIX B

M - ADMINISTRATION BUILDING

MA

ME

MD

MC

MB

M8

M7

M6

M5

M4

M3

M2

Ml

28200 37200

300

6000

6000

6000

6000

3600

8000

8000

8000

4200

60oo

exe

T

J

n

A

-

11 ““9

I

/

FC

A3 P2 A3 P2 G1 G1 ---- ------ ane

■

49

r J

11

r

h

“HO

TTIIH

——

IMIIIIIH

-JH—

■

*“0

VERTICAL GREENING

t

G4 ilfiA

_LU _LL

HL f

I I

"“V

r

mi

MM

II

-

=

■

■ -

=

"79

ct

ct

FC

G2 —

■

EX

•LV

7 TA

•ro

YIA

\

FC

A5 ELEVATION 1 (SCALE 1:300)

ELEVATION 2 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1 1)

M - 04 - ELEVATION

Appendix B - Figure B8

Design, Build and Operate

First Stage of Tseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

Appendix F - Hard Landscape Design

APPENDIX B

M - ADMINISTRATION BUILDING

MA

MC

MD

ME

M1

M2

M3

M4

M5

M6

M7

M8

28200

MB

¥

37200

4200

8000

8000

8000

3600

6000

6000

6000

600o

3600

6000 -s

+

G1 |||| |||

to

¥

lUiVOHilUIffl

“O

II

l.l

Ell

ram

—

jimimmimini

IS ............................... t......... ii ........ .................. i G1 P2 1 *WO

—

A3 i

/

I

I

II

T

■

—-

-

I

2 " r

FC

FC

I "Th

Me I

L3 i

/

•■4

j

I

vro

—

m

I

— •

am

::

II

I

—

Si

v n /

—

II

ELEVATION 3 (SCALE 1:300)

ELEVATION 4 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1 1)

M-05 - ELEVATION

Appendix B - Figure B9

Page 87

Page 88

Design, Build and Operate

First Stage ofTseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

Appendix F - Hard Landscape Design

APPENDIX B

G - REVERSE OSMOSIS & ELECTRICAL BUILDING

MATCH LINE

+

y

I

y

I

y

/

y

11250

11250

11250

12600

12850

7

—r

D1 D3 D1 D3 -

i

f

।

—।

।

I

I

l

I

I II-

mmm a

M

FC

FC

■

r

|

——

C

MATCH LINE

A5 A1 A5 !

132250 /

5400

5800

9850

12750

5500

11250

11250

11250

112

X

।

I

n

-

D1 D3 =

i

r

1

1 i

l

A

III

11111111E kl 11 Ij _ R\

Bl!

I

Ks

L

—

-

A5 A1 A1 SS

ELEVATION 1 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1 1)

G-08 - ELEVATION

Appendix B - Figure B26

(acciona MW

AJC JOINT VENTURE

Design, Build and Operate

First Stage ofTseung Kwan O Desalination Plant

Appendix F - Hard Landscape Design

APPENDIX B

G - REVERSE OSMOSIS & ELECTRICAL BUILDING

MATCH LINE

11250

11250

5500

12750

9850

5800

5400

TOPRC

28.575n

I

1 I

I

(

ROOF FLO

26.575n

\

I

I

□L

■

D3 D1 SECOND FLO

20.050n

I

I

[

FIRST FLO

13.400n

I

I

I

£

im

1 7N

GROUND FLO

II

6.750n

\

I

I

—

MATCH LINE

A1 A5 SS

I

-

132250

12850

12600

11250

11250

11250

11250

1125®

/

7

I

I

I

I

I

FC

D3 D1 I

1 1 I

hl

“l

Hill I u

f

i

_ I

, 3.0.:

y..

-

y

Z

s

2

pi

EAll

UML

s

A

\

I

1

A5 VERTICAL

GREENING

A1 I

I

I

I

SS

ELEVATION 2 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1 1)

G-09- ELEVATION

Appendix B - Figure B27

Design, Build and Operate

First Stage of Tseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

Appendix F - Hard Landscape Design

APPENDIX B

G - REVERSE OSMOSIS & ELECTRICAL BUILDING

-1)L

t1

• OOI ,

i " i

/

■ G6-1)

40400 710

—

9300

710C

7100

9800

I

|

FC

"PrC

—

r

FC DC

D1 ““93% -

f

—==

■

7 [

I Mi

I

r.i ii ii ii

L

erstrLOO,

— "PV

I

CPGIDROCP

I

I

ELEVATION 3 (SCALE 1:300)

SS

©

——

©

-

Q

—

©

—

Q

GA

40400 7000

7250

9450

9450

7250

1 I

FC

I

I

£

—

1 EVERSE OSMOsis Him DING

A5

E.BJABLi

1

1

7

r

I

P2 I

-

JU

I

1

T

T

reztfut

t

——

|

r

lliBTIin:

oroD’O

*

IIIIIIIIIIIHIIIIIIIIIIHIIIillllllllllll II lllllllllllllllll WII!I m L." Hilf in III Illi i I

I

I

I

!

ELEVATION 4 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1

G-10 - ELEVATION

Appendix B - Figure B28

Page 92

Design, Build and Operate

First Stage of Tseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

Appendix F - Hard Landscape Design

APPENDIX B

C - ACTIDAFF

C10

C9

C8

C7

C6

C5

C4

C3

C2

C1

104000 1

11500

7000

5000

8250

17000

17000

17000

8250

13000

7

SS

DfMA LOUVRE WALL

"“5

FC

L

■

HH

iHIH

n

eee

f

-

4

ELEVATION 3 (SCALE 1:300)

CA

CB

CC

CD

CE

CF

P2 FC

G3 60100

5000

23050

4000

5000

ACTIDAFF

in

—•

Miillisii

T

r

r

T

i

1 1 1 ¥

0---------r

iiliiii*

1“

o5

§

5 I

:6000

ELEVATION 4 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1 1)

C - 06 - ELEVATION

Appendix B - Figure B36

Design, Build and Operate

First Stage of Tseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

Appendix F - Hard Landscape Design

APPENDIX B

J - PRODUCT WATER STORAGE TANK AND ELECTRICAL BUILDING

*

(7)

J3

D1 “ J5

J2 75.

6200

6500

12000

12250

18250

53950 D3 /

Si

■

]i

ROOF FLOOR

20.525vP0

i_____

1 V

FC

LI

FIRST FLOOR

14.675mPD

I

I

I

/

11 y

ay’s

A

T

J

Ts

A.

■Jit

A

CROUN258895

19)

waal

SS

VERTICAL GREENING

A5

\

ELEVATION 1 (SCALE 1:300)

JG

JC

JH

JF

JD

JB

JA

JE

62250 3o

12000

9T0

8680

8900

9en0

9250

D1 “Ai

A3 FC

ELEVATION 2 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1 1)

J - 02 - ELEVATION

Appendix B - Figure B41

Design, Build and Operate

First Stage of Tseung Kwan O Desalination Plant

(acciona MW

AJC JOINT VENTURE

Appendix F - Hard Landscape Design

APPENDIX B

J - PRODUCT WATER STORAGE TANK AND ELECTRICAL BUILDING

J6

(7)

5/94

J3

J2

JI

53950

18250

12250

750

10000

6500

6200

/

D3 FC

D1 -

-

4

[,7 D

13

II A

___

g

Y

-

SS

VERTICAL GREENING

A5 ELEVATION 3 (SCALE 1:300)

JC

JA

JB

JD

JE

JF

JG

JH

62250 3800

9250

8680

9670

8960

12000

.s

“s s

TSEUNG KWAN O DIS Al I NATION PLANT

W

******

D2 FC

FC

D1 111. ami

1 1 ms'

i i

TWo x

T

■MiliiBKI

£

I 111

IB

II

8. _

—

...

_ i l i h, .1. il r

corow

____

A2 SS

VERTICAL GREENING

A5 ELEVATION 4 (SCALE 1:300)

LEGEND

LEGEND

FAIRFACED CONCRETE

ALUMINIUM (BRIGHT COPPER)

ALUMINIUM (BLUE)

ALUMINIUM (W/. WOOD GRAIN PATTERN)

ALUMINIUM (WHITE) ALUMINIUM (GREY) S.S. (BEAD BLASTED)

CURTAIN WALL

GLASS WALL

GLASS BLOCK

GLASS WALL W/. REFLECTIVE COATING

PAINT IN GRAY

TEXTURED PAINT IN GRAY

DFMA CONCRETE PANEL (LIGHT GRAY, PLAIN) DFMA CONCRETE PANEL (LIGHT GRAY, BRUSHED) DFMA CONCRETE PANEL (DARK GRAY, RIBBED) P2

A4 A5 A2 G2

SS

FC

A1 G1

A3 G3

G4 D1 D2 D3 P1

J - 03 - ELEVATION

Appendix B - Figure B42

Page 96

Page 97

Page 98

Page 99

Page 100

Page 101

Page 102

Page 103

Page 104

Page 105

Page 106

Appendix F - Hard Landscape Design

Landscape Design | Pavement

1 ( "Uunmnnansnnn

I

I

CR

1‘

mVll

110

7‘lunn"lLszanumazmziussuzunaunnaum

[I

u

mes

r

A

7 II It

l

"Hi

L

Hl

5 ♦

' t

—

! It

3 |

I o

I

t"

: T

950 h hff]

—- - aal l < -

! -

ihr

r L

iEFr

d

J.

■ 11 u

I

151 4 ip

rdd

k

6 5

1—5

| !||

|

i

BE

1 AIHFAFALip.

IF

I

1 Concrete Road

t ■

Paver Block

1——

Wash Granolith Paving

0 5 10

20 50m

PAVING MODULE PLAN

MATERIAL SCHEDULE

(ILLUSTRATION OF DIFFERENT COLOURS OF THE RANDOM MIX OF PAVING BLOCKS) ■ .

3 “ t

ao

Y

100x200x60mm THK.

COLOUR: BROWN

PERCENTAGE: 50%

(

2‘

" ?

«C

.1

1,

1

Th

KK.

2

%

$

1.

1

am

L

-3

—V

Per

pade

-- a

EE

rP

_____

100x200x60mm THK.

COLOUR: LIGHT BROWN

PERCENTAGE: 30%

"t

1 00 •

t

4 N

----- -

I

r

Amma

—r

L

<■

V

100x200x60mm THK.

COLOUR: GREY

PERCENTAGE: 20%

eh

C.

f

d

. se%

8&

}

A_ _

1‘

)i/ • (

ri

in

00000 ■

PAVER BLOCK

WASH GRANOLITH PAVING

=Fi

(.

1 <

..

: 3. n

—a

8

-

d- .

CONCRETE ROAD

(FOR VEHICULAR)

Dam

—

Appendix A - Figure A12

TKO Desalination Plant

Appendix F - Hard Landscape Design (Paving Pattern)

Landscape Design | Typical Details

s

(A

MI

0 5 10m

17m

5m

8m

<

>

>

>

<

<

J

——m

a

w

. n

. ‘I,

“ i

—Th.

a.

t

oeeHe

4m

*

w

—

■

200X100X60mm THK. (PEDESTRIAN)

CONCRETE PAVER BLOCKS

Typical Kerb Detail

Paving Pattern

(ILLUSTRATION OF DIFFERENT COLOURS OF THE RANDOM MIX OF PAVING B

125

rn

100 27

FFL

250X125X250mm (H)

PRE-CAST CONCRETE K1 KERB

MIN. 20mm COMPACTED AND 7-10mm

LEVELLING SAND COURSE

' 11

kes

I .

ON EDGE SET LEVEL AND

POINTED IN 1:3 C/S MORTAR

100x200x60mm THK.

COLOUR: BROWN

PERCENTAGE: 50%

I

IE

*

2209080/05.3

O

O

4 2 OCC

FFL

4 R.C STRUCTURE BY ENGINEER

, e

TivunTy

I

l -

O

100x200x60mm THK.

COLOUR: LIGHT BROW

PERCENTAGE: 30%

100mm COMPACTED

GRANULAR SUB-BASE

d

A

100x200x60mm THK.

COLOUR: GREY

PERCENTAGE: 20%

100mm COMPACTED

GRANULAR SUB-BASE

.8

1

2

300

r

o8hs

d—।—DC

—

g

4

I

w

l

dI

GRADE 20/20 CONCRETE HAUNCHING

I I

D

i

=mes

Mlll

COMPACTED NORMAL SUB-GRADE

IHIIHI—H

fr• •

--

ILILLTTLLLLLTT

1 ERE

I,

B

l — I — I — I —II—I — I — I — I — I — I — I —

Appendix A - Figure A11

TKO Desalination Plant

Page 109

Page 110

Page 111

Page 112

Page 113

Page 114

Page 115

Page 116

Page 117

Page 118

Page 119

Page 120

Page 121

Page 122

Page 123

Page 124